Charging station including installation: The complete and professional guide to a comfortable transition to an electric vehicle
The electric revolution on Israeli roads has long been no longer a futuristic vision, but an everyday reality. More and more drivers are choosing to switch to electric vehicles, and as a result, the need for available, safe and fast charging solutions is growing. Despite the deployment of public charging stations across the country, every electric vehicle owner knows that the most convenient, affordable and efficient solution is home charging. If you are considering this step, the right and safest way is to choose the service of Charging station including installation. In this article, we will take an in-depth look at everything you need to know about installing charging stations, from the benefits of purchasing a combined package, through the professional steps of installation, to comparing prices and critical safety highlights.
Why is it worth purchasing a charging station including installation in one package?
When you approach the project of adding a charging point to your vehicle, you have two main options: purchasing the station separately and hiring an electrician to install it, or purchasing a charging station package including installation from one company. Choosing the second option carries significant advantages:
- One address for liability: When you purchase the stand and the installation from the same source, you prevent a situation of disclaimer of responsibility. If there is a malfunction, there will be no situation where the installer blames the stand manufacturer, and the manufacturer blames the installer. You have one address for every problem.
- Cost savings: Many companies offer a more attractive price when you purchase a charging station from them, including installation, compared to paying separately for the product and the labor.
- Perfect match between the position and the infrastructure: An installer who also supplies the stand knows it inside out. He knows exactly what infrastructure requirements it requires, what cable cross-section is appropriate for it, and how to configure it through the app in the optimal way.
Installing charging stations: What does the actual process involve?
A charging station installation project is not just about connecting a plug to an outlet. It is a complex electrical work that must be carried out according to the Electricity Law in Israel. Here are the main steps on the way to your electrified parking lot:
1. Site survey and feasibility study (usually carried out by phone or in a preliminary visit)
Before starting, the electrician must understand the layout of the area. What is the distance between the electrical panel and the parking lot? Is this a private home or a condominium? Is your electrical connection single-phase or three-phase? And what is the current load on the panel?
2. Planning and preparing the infrastructure
At this stage, the installer will lay a dedicated electrical cable from the electrical panel to the installation point. In many cases, additional work is required, such as cutting into the wall, threading cables in underground ducts, or routing cables through existing shafts in a shared building. It is important to ensure that the cable has an appropriate cross-section (usually a 5×2.5 or 5×4 mm square cable for three-phase stations).
3. Installing safety components in the electrical panel
According to the standard, each charging station requires the installation of a semi-automatic circuit breaker (MCB) and a dedicated circuit breaker. The type of circuit breaker is critical – a Type A circuit breaker (with built-in protection in the station for direct current) or a Type B circuit breaker is required, to prevent the risk of electric shock as a result of direct current leakage from the vehicle battery.
4. Fixing the position and connecting it
After completing the infrastructure work, the installer will attach the charging station to a wall or a dedicated pole, connect the electrical wires safely, and ensure complete water and dust tightness (IP54 standard or higher).
5. Software settings and customer guidance
Today, most stations are smart stations. The installer will connect the station to your home Wi-Fi network, set up the app on your mobile phone, and guide you on how to use it, how to set timers for charging during off-peak hours, and how to lock the station to prevent unauthorized use.
Price comparison: How much does a charging station cost, including installation?
The price range for a charging station including installation varies depending on the type of station, the complexity of the installation, the length of the cable required, and the need for unique additions (such as a steel pole, load management, or complex excavations). In the following table, we have compiled an up-to-date price estimate for the Israeli market:
| Type of service/product | Detailed description | Estimated price range (NIS, including VAT) |
|---|---|---|
| Basic charging station + standard installation | Stand without complex application (Plug & Play) up to 10 meters of visible cable, including electrical panel components. | 2,500 – 3,500 NIS |
| Smart charging station + standard installation | Three-phase stand with app connection, Wi-Fi, RFID identification. Installation up to 10 meters. | 3,500 – 4,800 NIS |
| Installation in a shared building (without load management) | Moving a cable from the apartment to the parking lot through existing shafts usually requires a longer cable (20-40 meters). | 4,000 – 6,500 NIS |
| Dynamic Load Management Add-on | A smart component installed in the electrical panel that prevents a tripping plug when other devices are operating in the home. | 700 – 1,200 NIS (additional price) |
| Dedicated installation page added | When there is no nearby wall in the parking lot, a dedicated metal pole must be installed and fixed to the floor. | 600 – 1,000 NIS (additional price) |
Note: The prices listed in the table are estimates and may vary depending on specific terrain conditions and the stand model selected.
Types of charging stations: How do you choose the right one for you?
When you are looking into installing charging stations, you will find that there are several main types on the market. It is important to choose a station that will fit not only your current vehicle, but also future upgrades:
- Single-phase vs. three-phase position: A single-phase station will provide a maximum of 7.4 kWh (kilowatt-hours), which means that a full charge will take many hours. In contrast, a three-phase station can reach 11 to 22 kWh, and can charge the vehicle three times faster (assuming the vehicle supports it and you have a three-phase infrastructure at home). The overwhelming recommendation today is to install a three-phase station in preparation for the future.
- A 'stupid' position versus a smart position: A dumb station simply starts charging as soon as you plug in the cable. A smart station connects to your wireless network, allowing for remote control, monitoring of power consumption history (great for work expense reimbursement purposes), scheduling cheaper charging times, and digital locking.
- Dynamic Load Balancing: One of the most important features. This is a component that reads the overall electricity consumption of the house in real time. For example, if you turn on an air conditioner, a water heater, and a washing machine at the same time, the component will automatically lower the charging rate of the vehicle to prevent the main electricity from jumping.
Installing a charging station in a condominium – special highlights
Installing charging stations in a private home is relatively simple, but in a shared building there are additional challenges that need to be considered when purchasing a charging station, including installation. First, if your parking space is registered in the land registry, you have every right to install a station. However, you must route the cables in a way that does not harm the appearance of the building or endanger the residents, and in most cases inform the building committee.
Additionally, if you connect to the building's public panel (when it is not possible to connect to the apartment panel), you will need to install a separate consumption meter and arrange payment with the building committee. In cases of buildings with multiple electric vehicles, it is recommended to consider a central load management system for the entire building.
Safety, Standards and What's In Between (EEAT)
When it comes to electricity and vehicles worth hundreds of thousands of shekels, there is no room for compromise. Absolute obligation Make sure the installer who comes to you is Licensed electrician Has a valid license from the Ministry of Labor. An unqualified installer may cause irreversible damage to the home electrical system, the vehicle battery, and even cause fires.
Make sure that the price quote for a charging station including installation details the type of materials that will be used: the type of cable (durable green XLPE cable is recommended), the type of insulation, and that proper testing will be performed at the end of the installation using a dedicated device for testing charging stations (such as a fault loop resistance test - LT). At the end of the installation, make sure to obtain a test certificate signed by the electrician, which will be useful to you in the event of insurance or a warranty claim.
Summary
Switching to an electric vehicle is a smart and economical step, and the convenience of home charging is an integral part of the experience. Choosing a package of Charging station including installation Guarantee you peace of mind, cost savings and one clear address for every inquiry. Remember that installing charging stations is a job for experts only. Don't compromise on a qualified electrician, choose an advanced station that will serve you well in the future, and make sure everything is done according to the strictest standards. This way you can wake up every morning to a fully charged vehicle, ready for a safe and green drive.